To Do list



Updated 10/12/11
Urgent Projects
Remove Wall Paper
Paint Walls
Fix floor
Replace door knobs on our entrances
Change Kitchen Sink Faucet
Change Bathroom sink faucet
Remove shutters from 'window' in bathroom





Initial Projects
Install fan/vents for bathroom, laundry area.
Repaint whole interior
Remodel bathroom
Remodel kitchen
pour concrete for car access to park beside the house
Make access to closet from master bedroom, closing off from 2nd bedroom.
3 way light switches for parents light and our light in enterance/stairway near front door (currently only switch by main individual enterances)



Eventual Projects
Add Tankless water heater
Run new electrical from circuit breaker to existing and new outlets, adding breakers for each room if need be (Possibly to basement too)
Clean out and fix up basement
Plant things in backyard


Dream Projects
Add Solar to roof
Move kitchen to living room
Convert kitchen to walk-in closet and master bath. (or 3rd bedroom for foster children)